Home > News > T&M’s Hiral Gaudani talks Accelerated Bridge Construction in Precast Solutions Magazine

T&M’s Hiral Gaudani talks Accelerated Bridge Construction in Precast Solutions Magazine

August 6, 2021

The R-27 bridge in Keansburg, NJ was in dire need of repair. Monmouth County tapped it for replacement and hired T&M to evaluate potential solutions for the bridge. A precast concrete three-sided culvert bridge was selected utilizing Accelerated Bridge Construction.

T&M’s Project Manager, Hiral Gaudani, PE, comments on the unique aspects of the design in the summer issue of Precast Solutions Magazine.

Read the full article here.